Epo-Prime 100
- Used as a primer due to low viscosity
- Reduces outgassing in subsequent coats — ideal for metallic / pearl / self-levelling subsequent coats
- Can be used with aggregates / sands as patching / render / cove mix
- Tolerant to moisture (MC will need to be less than 7%)
- Applied typically at 200 Microns wet to soak into prepared concrete
- Technical Pot Life 30 mins @ 25°C (100ml mix)
- Finish: Clear
- Colour: Amber
- Gloss: High Gloss
- Tack Dry after 5 hours @ 25°C Substrate Temp
- Hard Dry after 7 hours @ 25°C Substrate Temp
- Full Cure 7-14 Days @ 25°C Substrate Temp
- Minimum Recoat Time 5 hours @ 25°C Substrate Temp
- Maximum Recoat Time 3 days @ 25°C Substrate Temp
- Not UV Stable
- Product requires up to 14 days to develop full-chemical cure
- Kit sizes 8L, 20L
- Available in Clear
EPO-BASE SL100
- Used primarily as a Base / Body Coat and Top Coat
- Great self-levelling characteristics
- Perfect for Flood / Glaze coats and Metallic / Pearl Body Coats
- Can be used with aggregates /sands as patching / render / cove mix
- Tolerant to moisture (RH < 85%)
- Applied typically at 200 Microns
- Technical Pot Life 45 mins
- Finish: Clear / Pigmented
- Gloss: High Gloss
- Tack Dry after 3 hours @ 25°C Substrate Temp
- Hard Dry after 4 hours @ 25°C Substrate Temp
- Full Cure (99%) 5 hours @ 25°C Substrate Temp
- Minimum Recoat Time 4 hours @ 25°C Substrate Temp
- Maximum Recoat Time 4 weeks @ 25°C Substrate Temp
- Aliphatic chemistry resists colour change
- Kit sizes: 30L
- Pigment Packs: 1L
- Available in: Clear, White, Grey, Black, Red, Yellow, Gold Rush, Blue